Wednesday, 28 June 2017

Project design work

Date: 26/6/2017-28/6/2017
  
            3D Design Of Project
      
      From 26th to 28th I completed the 3D designing of refrigerator chamber and cooling  system. I made the design of chamber and cooling system under guidance of Jetti sir. On first day I made design of chamber. But the assembly part was remain. Then I tried to made rough design of cooling system. I also made the design of chamber in google sketch. While sketching I learned new tags like push or pull, follow me, move.





Thursday, 22 June 2017

Assignment of Soil testing

Date:18/6/2017 to23/6/2017
                                                           Soil Testing
  On 18th june we started working on new assignment that was soil testing. As my friend vishakha was already work in soil testing lab she introduced us all the instrument and reagent in lab. She introduced us a Mridaparikshak.Previously for testing Prerana kit was used but now a days Mridaparikshak is use.In Mridaparikshakt consist of heating plate,shaker,                        . Mridaparikshak is soil analysis kit which help in determing pH,EC,OC,nitrogen,phosphrus,iron,
zinc,potassium,boron,sulphur.After that we started for soil testing. We distributed the test inbetween us.I performed the test of sulphur and potassium in soil.We take 10 samples of soil.After taking sample we sieve it and followed the procedure as given in manual. The material used for test is as follows
Material used:
  1.Mrifdaparikshak
  2.Weighing balance
  3.Test tube
  4.Filter paper
  5.Sieve
  6.Funnel
  7.Syringe
  8.Beaker
  9.Reagent bottles
  10.Measuring flask
         In manual separate procedure is given for determining pH, OC, EC,N, S, P, K, Zn, Fe, B.We followed that procedure and concluded a result.From that result farmer get the actual idea about nutrient content in his soil.After testing we were determine a result which is as follows
Farmer name:
Nutrient content:
       1.pH= 8.87
       2.EC= 0.87
       3.OC= 0.96
       4.N= 198
       5.Br=2.98
       6.K=125. 6kg/ha
       7.Fe=1.88
       8.S= 80.8Mg/kg
       9.Zn= 2.96
      10.P= 34.85
     As we got the result we conclude which nutrient have deficiency in soil and from this data we can also suggest the farmer how to increase the deficient nutrient.Suppose in soil potassium content is less then we can suggest the farmer why the potassium content is less and it will be increase as follows
 Reason for deficiency of potassium
            When we have low pH soil, we have low cation exchange capacity(CEC-the degree to which a particular soil can absorb and exchange cations), then that's associated with low K and that's sandy soil,potassium can leach out
due to precipitation or irrigation.
These soils are commonly deficient in potassium.
How to increase potassium
1.Add compost with fruit and vegetable waste.Compost is rich in nutrient
2.Bury citrus rinds directly in the soil.
3.Mix wood ash into the soil.
4.Use greensand.
Weighing soil

Shaking of soil

Adding reagent

Analysing nutrient content

Tuesday, 20 June 2017

Polishing and Painting of chamber

Date:15/6/2017-16/6/2017
    Polishing and Painting of chamber of refrigerator
              
                Already the cleaning of project we had done.But still the chamber was fully rusted from inside and outside. Then we started polishing of chamber woth the help of polish paper. The rust was so much.Each and every part got rusted.shubham sir suggested us use grinder for removing the rust.
 The rubber insulation of doors got
damaged.We removed that rubber insulation.
               Next day komal mam told us to do painting.We made rough the surface of previously painted wall by using sand paper.After that we started to applying redoxide to wall of chamber,inside fins and trays.
                                    

Selection and cleaning of chamber of refrigerator

Date:14/6/2017
      Selection and cleaning of chamber of refrigerator
              
                         At morning we all gathered together and we meet to komal mam. Then we discuss regarding project design.we want a chamber for refrigerator.Then we discuss with Ranajit sir and Dixit sir.They told ise the chamber of dryer as chamber of refrigerator. Then we saw the chamber.The chamber was too dirty.We did the cleaning of refrigerator with the help of cloth and broom.Then at night komal mam disassemble the unnecessary part.

Review of project and discussion of new project

Date: 13/06/2017
 
Review of project and discussion of new project
    
         At morning Ranajit sir told us they took review regarding our projects.We all made preparation regarding our protect work.At 11am
Ranjit sir and Dixit sir carried out the review. During review we herd all projects information we got some new ideas and progress of different projects. If any one have difficulty regarding his  project then all gave him suggestion.I also asked regarding my project sir told me for fitting a new pully.
                Ranjit sir gave us a new project of preparation of refrigerator. For this project they told to work with Miss Komal madam. After completing the review we meet to komal mam and discuss regarding project and we took the basic theory behind the project.
    
      

Monday, 19 June 2017

Project discussion and finding information

Date:12/6/2017
          On 12th june at morning l meet to Dixit sir for discussing regarding project. They told me different things on which l have to work.They told me the varios things that has been roasted in roaster like groundnut,besan,rice. I searched on google about the various roasting time of food ingredients and I collected the basic information 

Solid work theory

Date:10/6/2017
      On 10th june theory lecture of solid work taken by Akshay sir.
Akshay sir taught us about sketching.They give assignment of drawing horizontal and vertical line in classrooom and also told us to make pratice of drawing horizontal and vertical lines.Also they taought us regarding one point prospective, two point prospective.we made practice of drawing.

Project design work

Date: 26/6/2017-28/6/2017                3D Design Of Project              From 26th to 28th I completed the 3D designing of refrigera...