Monday, 19 June 2017

Project work

Date:11/6/2017
        On 11th june as l already got the basic information of my project by reading the report of vipul sir l meet to vikas. Vikas had already done some work on project l discussed with him and brought information about the advance technology that he made in vipul sir project.He brought a gear box and motor from pune for reducing the rpm.I helped to vikas for fitting pulley and motor. After completing all things we took trial by filling drum by stones.



Friday, 16 June 2017

Solid work

Date: 9/6/2017
         On 9th june Rahul jetti sir introduced us a new concept of solid work.They told the basic concept as well as the features of solid work.
Then they taught us how the various designs of solid work are made.They gave the basic information of various icons that used for designing.Then they told us for design. I made a design of charger pin. All my friends made a different design like diary,pen,powerbank,spring.
     
       
Charger pin

Saturday, 10 June 2017

Assignment of preparation of bed

Date:2/6/2017 to 8/6/2017

On this day jadhav sir gave us assignment in which we have to made a bed.The information regarding bed is as follows:                        

PREPARATION OF BED

Material used for preparation of bed :
1 . Square tubes
2 .Plywood
3 .Welding rods
4 . colour
5. Touchwood
6 . Primer ( Redoxide )
7 . Brushes
8 . Thinner






TABLE :  COST ESTIMATION
Material Cost :
Sr. no
Product name
Total products
Rate
Cost (Rs)
1
2* 1 tube
18 ft
19.5/ft
351
2
¾ * 3/4 tube
12.1 ft
8/ft
96.8
3
1.5 * 1.5 tube
7 ft
25/ft
175
4
Plywood
2.42*5.74 ft2
55/ft2
764
5
Welding rod
25
2.5/rod
62.5
6
colour
250 ml
250/1000ml
62.5
7
Touchwood
250 ml
300/1000ml
75
8
Primer
250 ml
180/1000ml
45
9
Brush
2 (2 inch)
50
100
10
Thinner
250 ml
140/1000ml
35


Labour cost is 15% of total material cost
Labour cost = 1767 * 0.15
                       =Rs  265
Electricity cost is 10% of total material cost
Electricity cost = 1767 * 0.10
                             = Rs 178
Total cost = 1767+265+178
                   =Rs 2210


PROCESSES PERFORMED DURING BED PREPARATION :
1 . Cutting
2 . Welding
3 . Grinding
4 . Painting
Cutting

Grinding

Welding

Painting



First day in vigyan aashram

Date: 1/6/2017

                         INTRODUCTION TO VIGYAN AASHRAM

Day 1:

1.On first day Supriya Madam told us about vigyan aashram and rules and regulations followed      in aashram.
2.After that we meet to Ranajit sir they told about various project in vigyan aashramand various      department in vigyan aashram viz. Energy and Environment, Fab lab, Agriculture and Human      health.
3.After that Prajkta saw us vigyan aashram and gave information about the various project that        has been done by various student in vigyan aashram
4.Some photo :






Friday, 9 June 2017

BIODATA

 BIODATA
              
Name : Namrata  Naresh  Diwale.
                              
Address : At Post Suseri No.1,Tal. Khed, Dist. Ratnagiri.
                                  
College Name: College Of Agril. Engg. & Tech. Dapoli. 
                
Birth date: 16/4/1997



                            

                            

                             

Project design work

Date: 26/6/2017-28/6/2017                3D Design Of Project              From 26th to 28th I completed the 3D designing of refrigera...